Sunday, April 29, 2012

Crew Shelter & Work Area

It has only taken a little over 10 years, but as of last November the 3751 crew has a concrete pad and shelter to work out of. While still needing some work, this area will have a welding table and vise and be where "junior", the electric cart, will be stored. It has overhead lighting for work that needs to be performed overnight as well as air connections for air tools. Electical outlets will eventually be installed as well.

We are all VERY excited about this new area of the compound. This project was seen as a "trial" run to the construction of a cover for the locomotive, for which many of the posts have already been obtained...so stay tuned over the next year or two to hopefully read about that project.



No comments:

Post a Comment